Cabinets & Countertops in Walnut: What the Job Actually Involves
New cabinets and countertops in Walnut usually run $14,000 – $45,000 for a full kitchen’s worth, with cabinet installation at $4,000 – $13,000 and countertop fabrication and install at $2,000 – $6,500. A typical job takes three to five weeks from demolition to final caulk, and most of that time is spent waiting on stone fabrication, not on the install itself. Call (844) 662-2335 for a free on-site estimate and a written, line-item quote.
How the work moves, stage by stage

Cabinet and countertop work goes wrong when the sequence gets rushed. Stone gets templated before the cabinets are shimmed level, or a homeowner picks a slab before the layout is final. Here’s the order we hold to, and where you make the calls.
Stage 1: Measure and layout (day 1). We verify wall-to-wall dimensions, check for out-of-square walls and floor dips (common in 1970s and 1980s Walnut builds), and confirm appliance sizes so the cabinet run doesn’t fight the fridge. You decide the cabinet footprint and door style here, because everything downstream depends on it.
Stage 2: Demo and rough-in (days 2 – 3). Old cabinets come out, drywall gets patched, and any electrical or plumbing relocation happens now. If a sink or range is moving, this is the stage that adds time and cost. A permit, where required, is pulled before this stage, not after.
Stage 3: Cabinet install and leveling (days 4 – 6). Base and wall cabinets go in, get shimmed and scribed to the wall, and the crown and filler pieces are fit. You’ll walk the layout with us before we lock it down. This is also when the countertop template gets scheduled, which matters because the template can’t happen until cabinets are set and level.
Stage 4: Countertop fabrication (7 – 14 days of wait). Stone is templated on site, cut at the fabricator, and returned. This gap is the single biggest timeline variable in the whole job, and it’s why we schedule it at the start rather than the end.
Stage 5: Countertop set, sink and faucet, final trim (days 2 – 3 after delivery). Slabs are set, seams are placed where you approve them, the sink is undermounted or drop-in per your choice, and the final trim, toe kick, and caulk get finished. You sign off at a walkthrough, and the workmanship is covered by our 730-Day Done Right Promise.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The options you’ll actually choose between
- Stock vs. semi-custom vs. custom cabinets. Stock comes in fixed sizes and lands fastest and cheapest; semi-custom lets you adjust widths and heights for a better wall fit and is the usual pick for Walnut’s non-standard room dimensions; full custom costs the most but solves odd angles and ceiling heights. KraftMaid is a solid semi-custom starting point.
- Cabinet box material. Plywood boxes hold up better to moisture and weight than particleboard, especially under a heavy stone top. The price gap is real but modest over the life of the kitchen.
- Quartz vs. granite vs. porcelain slab. Quartz is non-porous and doesn’t need sealing, which suits a busy household; granite is natural, unique, and needs periodic sealing; porcelain slab handles heat well but chips at edges if it’s hit hard. Cambria quartz is a strong middle ground on durability and finish.
- Edge profile and thickness. A standard eased edge keeps cost down; a thicker mitered edge reads more custom and adds fabrication labor. This is a finish decision, not a structural one, so it’s a good place to flex the budget.
- Drawers vs. doors, and pull-outs. Soft-close drawers and a pull-out trash or spice unit add cost but change daily use more than most upgrades. Worth pricing before you commit to a higher-grade door.
What Cabinets & Countertops costs in Walnut, CA

The honest answer is $14,000 – $45,000 for a full kitchen, and the spread is driven by a handful of variables you can actually control.
- Cabinet installation: $4,000 – $13,000. Box count, door style, and whether walls need straightening push this up or down.
- Countertop installation: $2,000 – $6,500. Material grade, square footage, edge profile, and seam count drive the number.
- Relocating plumbing or electrical: the biggest wildcard. Moving a sink or range means rough-in work and, often, a permit.
- Structural surprises: a load-bearing wall change or a floor that needs leveling adds cost that no honest bid can predict until the old cabinets are out.
A written estimate from us lists cabinets, countertops, demo, install labor, and permit fees as separate lines. It typically does not include appliances, lighting, or backsplash tile unless we scope those in. Upfront pricing means the number you see is the number you pay, and 0% financing for 18 months plus $1,000 off projects over $10,000 make a bigger job easier to absorb.
See the difference
Before
After
Before
After
Before
AfterWhat Walnut homes specifically do to this job
Walnut is a small, affluent, heavily owner-occupied suburb where most construction is high-end residential renovation and rebuild on large lots, and much of it has to clear the City of Walnut’s own building department rather than a big-county process. That means permits and inspections run on the city’s timeline, so a cabinet job that touches plumbing or electrical needs to be scheduled around that, not squeezed past it. The housing stock skews toward 1960s – 1990s custom and semi-custom homes, and those kitchens show a few recurring patterns: cabinet boxes that have softened with age, walls that are slightly out of square, and countertops that were cut for older appliance footprints. Because Walnut sits at the foot of the Puente Hills in a hot, dry inland microclimate, cabinetry near exterior walls and windows takes more heat and sun load than coastal homes, which is worth factoring into finish choices. Properties along the northern hillside edge also carry grading and view considerations, and if your kitchen work is part of a larger addition, that review adds lead time.
If cabinets and countertops are one piece of a bigger job, they often pair with Kitchen Remodeling in Walnut or a Garage Conversion ADU in Walnut, and a few homeowners route the work through our Kitchen Remodeling service or a New Detached ADU in Walnut project. We cover the full Walnut area, including the neighborhoods off the hillside edge, and our technicians have up to 12 years of experience.
Serving Walnut, CA – Our Local Coverage Area
We serve Walnut and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Cabinets & Countertops in Walnut

Most jobs take three to five weeks, with the bulk of that being stone fabrication wait time rather than active install. Call (844) 662-2335 for a timeline specific to your kitchen.
A straight swap usually doesn’t require one, but relocating plumbing or electrical, or changing a wall, does. We pull the permit and handle the inspection so it isn’t your problem. Call (844) 662-2335 to confirm your scope.
Yes, and it’s the most common approach, keeping the sink and range where they are and fitting new cabinets around them. It’s faster and cheaper than relocating, and it’s how most Walnut homes we work on get done.
Expect $14,000 – $45,000 for a full kitchen, with cabinets at $4,000 – $13,000 and countertops at $2,000 – $6,500. Call (844) 662-2335 for an exact quote, free.
Every project is covered by our 730-Day Done Right Promise: if it’s not done right, we make it right. It’s one of the longest workmanship guarantees in the residential construction space.
Get a free cabinets & countertops estimate in Walnut
We’ll walk your kitchen, measure the space, and hand you a written, line-item estimate for cabinets and countertops, with no pressure and no surprises. Call (844) 662-2335 and a live person answers around the clock to set up the on-site visit. From foundation to finish line, it’s one crew and one guarantee.