A Groundwork company - serving West Covina, CA
A new rear addition with a vaulted beamed ceiling and tall windows
New Detached ADU · Citrus, CA

New Detached ADU in Citrus - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in West Covina
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
A freestanding soaking tub in a remodeled primary bathroom
A newly finished roof with a ridge vent and step flashing
A new front entry door with glass sidelights
A new black aluminum pool fence with a gate
A new curved paver walkway to the front porch
A galley kitchen opened up to the dining room with a new peninsula
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

What a New Detached ADU in Citrus, CA Costs and How Long It Takes

A new detached ADU in Citrus, CA typically runs $45,000 – $130,000 for the site-built range, with larger or fully self-contained units landing closer to the $90,000 – $220,000 ADU construction band. Plan on 6 to 10 months from the first stake in the ground to the final inspection, depending on site work and how fast the hillside grading review moves. Call (844) 662-2335 for a free on-site estimate before you commit to a footprint.

Call (844) 662-2335

Citrus is acreage country. Lots along the foothill transition zone are wide, sloped, and often still carrying the bones of an old grove – buried irrigation lines, stone retaining walls, and outbuildings that were never permitted. That reality shapes a detached ADU on this side of the San Gabriel Valley in ways it doesn’t in the flat tract neighborhoods to the south. Most of the homeowners we talk to here want one thing: the job done right in a single pass, with the heavy components sized for a real property, not a starter kit. This page is about the standalone unit only. If your project folds into a wider remodel or second structure, the broader Home Additions & ADU in Citrus page covers the full scope.

How We Build a New Detached ADU in Citrus, Stage by Stage

A remodeled family room with new windows and a window seat

Five stages, each with a decision point. Here’s what actually happens and when you have to weigh in.

Stage 1: Site walk and feasibility (week 1)

We walk the lot, check slope, access for equipment, and where utilities enter. On Citrus hillside parcels we also flag any buried grove lines and old stone walls we can see or expect to hit. You decide the general placement and size at this stage – everything downstream depends on it. No demolition happens in week one; this is survey and conversation.

Stage 2: Design, engineering, and permitting (weeks 2 – 10, varies)

Working drawings, structural and seismic engineering where the slope demands it, and the submittal to the city. Grading on hillside lots here runs through the city’s hillside grading review, so this stage is the one that varies most – flat-lot projects move faster, sloped ones wait longer. You sign off on the final plan set and the finish schedule before anything is submitted.

Stage 3: Site prep, grading, and foundation (weeks 1 – 4 of construction)

Clearing, grading, forming, and pouring. On a slope this is also where stabilization or retaining work happens. This is the stage where the excavation surprises show up – old irrigation piping, buried walls – and where the concrete crew earns its keep. You’ll also see the drive or path access get roughed for the pour, which many homeowners pair with Concrete Driveways & Concrete Work in Citrus so a single site visit handles both.

Stage 4: Framing, rough-in, and enclosure (weeks 5 – 16)

Walls up, roof on, windows and doors set, then plumbing, electrical, and HVAC roughed in before insulation and drywall close the walls. You choose fixtures, finishes, and appliances on a schedule we give you – not the week they’re needed. Getting those picks locked before drywall saves weeks.

Stage 5: Finishes, inspections, and close-out (weeks 17 – 24)

Trim, paint, flooring, fixtures set, mechanicals tested, and the final inspection passed. We walk the finished unit with you and hand over the paperwork. Every project carries our 730-Day Done Right Promise – if it’s not done right, we make it right.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

What You’ll Choose for a Detached ADU in Citrus

The unit you end up with is a series of trade-offs, not one big decision. Here’s where the money and the longevity live.

  • Build method. Site-built gives you total freedom on footprint and finishes and is what most Citrus lot shapes actually require. Panelized and modular systems like those from Dvele or Mighty Buildings speed the assembly phase, but you’re committing early to a standard module size. On an irregular foothill lot, site-built usually wins.
  • Foundation and slope work. A cut-and-fill foundation with retaining is common here and adds cost; pier-and-grade-beam can suit a steep grade. This is the item that most often pushes a Citrus job toward the high end, and the one you should never shortcut.
  • Roof and envelope. The intense sun and Santa Ana winds strip cheap exterior materials fast. Class A roofing and upgraded siding last materially longer in this climate and reduce wildfire exposure on lots near the wildland interface.
  • Systems. Standard split system versus a ductless mini-split is the usual fork; on a compact detached unit, mini-splits often win on cost and efficiency. Tank or tankless water heating comes next, and it’s a decision you want made before rough-in.
  • Self-contained versus shared utilities. Tying into the main house’s electrical and water is cheaper on paper. A full set of separate meters and services is more forgiving long-term and better if the unit will ever be rented. You decide this in Stage 2.

What New Detached ADU Construction Costs in Citrus, CA

A framer checking new wall framing on a home addition

The realistic band for a detached ADU in Citrus is $45,000 – $130,000, with a fully outfitted, self-contained unit running into the $90,000 – $220,000 ADU construction range. Five things move that number:

  • Size and footprint. More square footage means more foundation, framing, and envelope – a small one-bedroom sits at the low end, a two-bedroom with a full kitchen and bath at the high end.
  • Site condition. Steep grade, retaining walls, or long utility runs add real money. Flat, clean lots sit lower.
  • Moving plumbing, electrical, and structure. If the design forces a re-route or a new service, expect the number to climb.
  • Material grade. Entry-level finishes versus a full custom kitchen and bath can swing tens of thousands.
  • Permit and inspection scope. Hillside grading review and seismic upgrades expand the pre-construction stage and the cost line.

A written line-item estimate spells out foundation, framing, envelope, mechanicals, finishes, permits, and site work separately. What it doesn’t blanket-cover is unforeseen excavation – buried grove lines or an unmarked wall are changes we price transparently, not surprises we spring. Upfront pricing, no change orders unless the ground forces one.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Citrus Homes Specifically Do to a Detached ADU Project

Citrus sits in the foothill transition zone of the San Gabriel Valley, with a housing stock that runs from 1920s – 1940s Spanish Colonial and Craftsman bungalows near the historic core to 1950s – 1970s ranch-style tract homes on the slopes. The detour that matters most for an ADU isn’t the main house – it’s the ground. Steep lots, the city’s hillside grading ordinances, and old un-reinforced masonry outbuildings from the citrus era all change the foundation plan and add review time. We regularly hit buried grove irrigation lines and old stone walls during excavation here, and account for them in the site plan rather than during the dig. Winter rains running down the slope are the failure mode we plan against with drainage and stabilization. Pre-1950 homes on the parcel sometimes need seismic attention too. If your lot needs a new access drive in, homeowners often pair the ADU with Paver Driveways in Citrus to do both in one mobilization. We cover the whole city – see the Citrus service area page for what else we handle here.

Serving Citrus, CA – Our Local Coverage Area

We serve Citrus and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – New Detached ADU in Citrus, CA

A new concrete driveway with a paver border

Get a Free Estimate for a New Detached ADU in Citrus

Call (844) 662-2335 to schedule your free on-site estimate for a new detached ADU in Citrus. We’ll walk your lot, flag the slope and buried surprises, and hand you a written line-item quote with a real range – no vague ballpark. A live person answers any hour. Learn more about our Home Additions & ADU work, and ask about $1,000 off projects over $10,000 and 0% financing for 18 months.

Why Citrus Chooses Groundwork Construction Co. of West Covina

We set the standard for new detached ADU in Citrus.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Citrus

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Citrus Customers Say

Trusted by homeowners across Citrus and surrounding areas.

★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new roof with clean valleys and new flashingA new multi-panel patio door opening a kitchen to the patioA new stained cedar privacy fenceA new paver patio with a seat wall and fire pitA remodeled primary bathroom with a soaking tub and walk-in showerA new clay tile roof

More services in Citrus

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in West Covina

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your West Covina team

A local vetted partner works across West Covina and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in Citrus?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Citrus.

(844) 662-2335

Request a Free Estimate in Citrus

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch