A Groundwork company - serving West Covina, CA
A new rear addition with a vaulted beamed ceiling and tall windows
Garage Conversion ADU · Citrus, CA

Garage Conversion ADU in Citrus - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in West Covina
A finished backyard cottage with a small covered porch
A single-story rear room addition with tall windows and a new patio
A new front entry door with glass sidelights
A new black aluminum pool fence with a gate
A new curved paver walkway to the front porch
A galley kitchen opened up to the dining room with a new peninsula
A walk-in shower with large-format tile and a built-in niche
A standing-seam metal roof over a covered porch
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in Citrus, CA: What It Takes and What It Costs

A garage conversion ADU in Citrus, CA runs $30,000 – $80,000 for the conversion work itself, and $45,000 – $130,000 when the project pulls in the site work, utility upgrades, and finishes a full habitable unit needs. Most conversions we build here take 14 to 20 weeks from permit to final inspection. Call (844) 662-2335 for a free on-site estimate and we’ll walk your actual garage, not a template.

Call (844) 662-2335

What separates a good conversion from a permitted shed with a bed in it: the unit has to stand on its own for sleeping, cooking, and bathing. That means a real kitchen, a real bathroom, heat, insulation, and a separate address if the city wants one. In Citrus, where a lot of garages sit on sloped foothill ground or attach to 1950s and 1960s ranch homes with shallow slabs, the conversion has to solve for the site before the finishes go in.

How a Garage Conversion ADU Comes Together in Citrus

A garage converted into a guest room and home office

Here’s the real sequence, with the durations we see on Citrus jobs and what you’ll be deciding at each stage.

Stage 1: Site check and feasibility (1 – 2 weeks)

We measure the garage, check the slab thickness and condition, trace where the water heater, panel, and any gas lines sit, and pull the property’s zoning record to confirm an ADU is allowed on your lot. You decide whether you’re converting the whole garage or keeping a storage bay. On Citrus hillside lots we also look at drainage and grade at the garage door opening, since water running downhill toward a converted garage floor is a common problem here.

Stage 2: Design and permitting (4 – 7 weeks)

We produce the plans, then submit to the city and respond to plan-check comments. You make the big finish decisions here: layout of the kitchen and bath, window placement, and whether the unit gets a separate entry off the alley or the street. Permit timelines in Citrus vary with how complete the plans are, so this is where a design that anticipates the review pays off.

Stage 3: Demo, framing, and rough-in (3 – 4 weeks)

Out comes the old garage door, the storage shelving, any rotted framing, and the old slab if it’s undersized. We frame the new interior walls, cut in windows, and run rough plumbing and electrical for the kitchen and bath. You’ll decide fixture locations now, because moving a drain after rough-in gets expensive. This is also when we trench new utilities out to the sewer or main panel, which on older Citrus properties is where buried citrus-era irrigation piping and old stone walls occasionally turn up.

Stage 4: Insulation, drywall, and systems (3 – 4 weeks)

Insulation goes in, drywall goes up, and the mechanical, electrical, and plumbing systems get their rough inspections. You pick cabinet and counter packages here. We can set you up with brands like KraftMaid and Cambria if you want a known quality tier, or work with what you’ve already chosen.

Stage 5: Finishes and final walkthrough (4 – 5 weeks)

Tile, flooring, paint, cabinets, counters, fixtures, and appliances land in this window. Then comes the final inspection and your walkthrough. If we’ve done our job, the punch list is short and the unit’s ready to rent or hand to family.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices That Shape Your Garage Conversion ADU

  • Slab-on-grade vs. raised floor. Most Citrus garages have a slab, so staying on it is the cheapest route at $45,000 – $65,000 for the base conversion. If the slab is cracked or the garage sits on a slope, a raised floor or a new slab adds cost but solves drainage.
  • Kitchenette vs. full kitchen. A full kitchen with range, sink, and fridge is what makes the unit rentable. A kitchenette saves some money but limits who’ll live there.
  • Prefab or stick-built enclosure. Companies like Boxabl and Mighty Buildings make modular units you can drop onto a prepared foundation; we can coordinate with those systems, but they work best when the garage is being torn down and replaced rather than converted.
  • Insulation and window grade. The San Gabriel Valley sun is punishing, so we spec higher R-value insulation and dual-pane windows. It adds a few thousand upfront and cuts summer cooling bills.
  • Bathroom type. A walk-in shower is easier to fit in a narrow garage footprint than a tub. A tub-to-shower layout keeps the wet area compact.

What a Garage Conversion ADU Costs in Citrus, CA

A framer checking new wall framing on a home addition

Plan on $45,000 – $130,000 for a finished garage conversion ADU in Citrus. That headline range is honest but wide, so here’s what moves it.

Line item Typical Citrus range
Base conversion (demo, framing, drywall, MEP) $30,000 – $80,000
Full kitchen and bath package $9,000 – $28,000
Slab repair or new floor $4,500 – $12,000
Permit fees and inspections Varies with scope; quote in writing
Site work, drainage, entry $5,000 – $18,000

A concrete driveway or apron repair where the old garage door sat is often part of this; see Concrete Driveways & Concrete Work in Citrus.

What pushes the number up: a slab that has to be replaced, moving the panel, running a new sewer line, hillside grading, and finish tier. What keeps it lower: a sound existing slab, existing plumbing and electrical you can tie into, and mid-grade finishes. Every written estimate lists what’s included and what isn’t, so you’re not guessing.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Citrus Homes Do to This Job

Citrus sits in the foothill transition zone, where steep lots and early citrus-era homes create conditions the flat valley cities don’t have. That means garage conversions here often hit slope and drainage problems before they hit finish problems. On a hillside lot, the garage floor may sit below grade at the back, so we spec a new slab and a drainage solution before anything else goes in. Winter rains can push water toward the garage opening, so the entry and apron drainage matter.

Serving Citrus, CA – Our Local Coverage Area

We serve Citrus and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked: Garage Conversion ADU in Citrus

A new stained cedar privacy fence

Get a Free Estimate on Your Citrus Garage Conversion ADU

If you own a garage in Citrus and a piece of land around it, you may already be sitting on part of an ADU. Call (844) 662-2335 for a free on-site estimate – we’ll measure the garage, confirm what’s feasible, and put a written range in front of you. A live person answers, 24/7. You’ll get an honest number, a clear timeline, and a crew that shows up in uniform.

Written by the team at Groundwork Construction Co.

Why Citrus Chooses Groundwork Construction Co. of West Covina

We set the standard for garage conversion ADU in Citrus.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Citrus

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Citrus Customers Say

Trusted by homeowners across Citrus and surrounding areas.

★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A remodeled hall bathroom with subway tile and a floating vanityNew architectural shingles with a clean valleyA new roof with clean valleys and new flashingA new multi-panel patio door opening a kitchen to the patioA new paver patio with a seat wall and fire pitA remodeled primary bathroom with a soaking tub and walk-in shower

More services in Citrus

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in West Covina

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your West Covina team

A local vetted partner works across West Covina and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Garage Conversion ADU in Citrus?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Citrus.

(844) 662-2335

Request a Free Estimate in Citrus

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch