







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterCabinet Installation & Refacing in West Covina, CA
Cabinet installation in West Covina typically runs $4,500 to $12,000 for a standard kitchen with new semi-custom boxes, and refacing runs $2,800 to $7,200 for the same footprint. If your cabinet doors stick, the boxes are sound, and you want a new kitchen look without tearing everything out, refacing is usually the smart money. If the frames are swollen from a past leak, the layout fights you every time you cook, or you’re planning to sell in the next few years, full installation makes more sense.
We do both, and we tell you which one your kitchen actually needs before anyone orders a single door. Groundwork Construction Co. of West Covina has been building and remodeling kitchens since 2014, and cabinets are one of the few trades where the difference between a good result and a bad one comes down to measuring twice and leveling once. Call (844) 662-2335 and a live person picks up, day or night.
This work sits inside our larger Kitchen Remodeling in West Covina service, and most cabinet jobs we take on connect to a bigger plan: new countertops, a relocated sink, better lighting. If you’re weighing a full kitchen overhaul, start with our Kitchen Remodeling page to see how cabinets fit into the whole picture.
Key Takeaways
- Refacing in West Covina runs $2,800 to $7,200; full cabinet installation runs $4,500 to $12,000 for a standard kitchen.
- We quote the number before work starts. Upfront pricing, no surprises – the price you see is the price you pay.
- Every cabinet job is covered by the 730-Day Done Right Promise. If it’s not done right, we make it right.
- Our technicians have up to 12 years of experience, and they arrive background-checked and in uniform.
- 0% financing for 18 months plus $1,000 off projects over $10,000 keeps a bigger kitchen budget workable.

When You Need Cabinet Installation & Refacing
Cabinets take more abuse than almost anything else in a house. Doors get slammed, hinges wear out, and the boxes hold up heavy stacks of dishes for years. Here are the situations we hear most from West Covina homeowners.
- Your doors and drawers are falling apart but the boxes are solid. Sagging hinges, cracked drawer fronts, and peeling laminate are cosmetic problems. If the cabinet frames are square and dry, refacing gives you a brand-new look for roughly half of a full replacement.
- You had water damage near the sink or dishwasher. West Covina’s older ranch homes and 1970s tract houses often have particleboard boxes that swell and crumble once a slow leak gets in. Swollen frames can’t be refaced. They have to come out, and that’s an installation job.
- Your kitchen layout wastes space. Maybe the corner cabinet is a black hole, the pantry is a narrow closet, or there’s no room for the dishwasher you want. Refacing keeps the layout exactly as it is. If the layout is the problem, we’re moving boxes, not just doors.
- You’re updating before a sale or a rental turnover. A fresh cabinet finish and new hardware changes how a kitchen reads in photos more than almost any other upgrade for the money. Refacing gets you there without a full tear-out.
- Soft-close and full-extension drawers are on your list. Original 1980s cabinets in much of West Covina were built with basic hinges and friction-fit drawers. We can retrofit modern hardware during refacing or build it in during installation.
- The cabinet finish is dated but the wood underneath is fine. Honey oak from the 1990s is the most common finish we’re asked to update in this area. A new door style and finish modernizes the whole room.
If any of these sound familiar, a quick assessment settles it. Call (844) 662-2335 for a free estimate and design consult.
Our Cabinet Installation & Refacing Process
Every kitchen is different, but the sequence stays the same. Here’s how a cabinet job runs from first call to final walkthrough.
- Free estimate and design consult. We measure the kitchen, check the condition of the existing boxes, and talk through what you actually want the room to do. You get a written price before anyone commits. If refacing will work, we say so. If it won’t, we say that too.
- Material and door-style selection. We walk you through door profiles, finishes, and drawer hardware. For full installations, we work with trusted brand partners so you’re choosing quality, not just whatever’s on the shelf. Finishes in this region hold up better when they’re rated for our dry, hot summers and occasional humidity swings, and we factor that in.
- Protection and demolition (installation only). Floors and countertops get covered. Old cabinets come out clean, and we check the wall and floor behind them for water damage or out-of-square framing. West Covina homes from the 1950s through the 1980s often hide surprises back there, and we handle them before new boxes go in.
- Installation or refacing. New cabinets get shimmed, leveled, and anchored to studs. Refacing means new doors and drawer fronts over the existing frames, plus new veneer or paint on the exposed box faces. Either way, we check every door for alignment and every drawer for smooth travel before we call it done.
- Hardware, trim, and finishing touches. Handles, pulls, soft-close hinges, crown, and filler strips go on last. We make sure the reveal lines are even and the gaps are tight.
- Final walkthrough. We open and close every door and drawer with you. Anything that isn’t right gets fixed before we leave. Every job carries the 730-Day Done Right Promise – if it’s not done right, we make it right.
Most refacing jobs finish in a few days. Full installations take longer depending on the scope and whether countertops or plumbing are involved. We’ll tell you the timeline in writing upfront.

Cabinet Installation & Refacing Pricing in West Covina
Cabinet work in West Covina runs from about $2,800 for a basic refacing to $12,000 or more for a full installation on a larger kitchen. Here’s a line-item breakdown so you can see where the money goes. These are honest ranges for this market, not teaser numbers.
| Scope | Typical Range | What’s Included |
|---|---|---|
| Refacing, standard kitchen (up to ~20 doors) | $2,800 – $5,500 | New doors and drawer fronts, veneer or paint on box faces, hardware |
| Refacing, larger kitchen or premium doors | $5,500 – $7,200 | More doors, upgraded finishes, added trim and crown |
| Full installation, semi-custom stock cabinets | $4,500 – $8,500 | Removal, new boxes, install, hardware, basic trim |
| Full installation, custom or premium cabinets | $8,500 – $12,000+ | Custom layouts, premium finishes, complex configurations |
| Added features (pantries, islands, pull-outs, soft-close) | $400 – $3,000 | Varies by scope and configuration |
What pushes the number up: the number of doors and drawers, the door material (thermofoil is the budget option, solid wood and premium laminates cost more), whether plumbing or electrical gets moved, and whether the layout changes. What keeps it down: keeping the existing layout and boxes, choosing refacing over installation, and picking standard hardware instead of custom pulls.
We don’t do surprise line items. Upfront pricing, no surprises – the number we quote is the number you pay. That’s why we do a free estimate and design consult before you commit to anything. If your project clears $10,000, you get $1,000 off, and 0% financing for 18 months is available to spread out the rest. Call (844) 662-2335 to get your number.
If your kitchen plans stretch beyond cabinets – new counters, a window, an added pantry – our Kitchen Remodeling team can line up the whole job. Prefer to plan department by department? We can sequence cabinets now and counters later. We also offer Bathroom Remodeling and Bathroom Remodeling in West Covina if the same worn-out cabinet problem is showing up in the hall bath. And if a bigger structural plan is on the table, our Home Additions & ADU and Home Additions & ADU in West Covina pages cover the build side. Prefab modules from builders like Prefab ADUs even come with their own cabinet layouts, and we can match the kitchen to them.
Cabinet refacing vs. replacement: which costs less and when?
Refacing costs roughly 40 to 60 percent less than full replacement, and it’s the right call when your boxes are solid and the layout works. Replacement costs more upfront but fixes the layout, replaces water-damaged frames, and resets the whole kitchen. On a standard West Covina kitchen, that’s the difference between about $2,800 and about $12,000. The honest answer comes from an inspection, not a phone guess. Call (844) 662-2335 and we’ll tell you which one your kitchen actually needs.
Do cabinet installation and refacing add to a bigger remodel budget?
Yes, and they’re usually the biggest line item in a kitchen remodel after project management. Cabinets typically make up 25 to 35 percent of a full kitchen budget. Because refacing trims that line so much, a lot of West Covina homeowners pull off a kitchen refresh for meaningfully less than a full overhaul. Budget that number in from the start and everything else gets easier to plan.
FAQs – Cabinet Installation & Refacing
How much does cabinet installation cost in West Covina?
Cabinet installation in West Covina typically costs $4,500 to $12,000 for a standard kitchen, depending on whether you choose semi-custom or custom cabinets. Refacing is the cheaper route at $2,800 to $7,200. The number moves with door count, material, and whether you change the layout. Call (844) 662-2335 for an exact quote – estimates are free.
Can you reface cabinets with water damage?
No. Refacing only works on sound, dry cabinet boxes. If the particleboard has swollen or the frames are soft near the sink, those boxes have to be replaced. That’s an installation job, not a refacing one. We check for water damage during the free estimate and tell you upfront what we find. Call (844) 662-2335 to set one up.
How long does cabinet refacing take?
Most refacing jobs finish in a few days, depending on the number of doors and whether we’re painting or installing new veneer. Full installations take longer, usually one to three weeks depending on scope and lead times on the cabinets themselves. We put your timeline in writing before work starts. Call (844) 662-2335 to talk through your kitchen.
Do you offer financing on cabinet projects?
Yes. We offer 0% financing for 18 months, and projects over $10,000 get $1,000 off. That’s on top of the free estimate and design consult. If your cabinet job runs into a larger kitchen plan, the savings and financing apply to the whole project, which takes pressure off a bigger number. Call (844) 662-2335 and we’ll walk you through the options.
Ready to get your kitchen cabinets sorted? Call (844) 662-2335 for a free estimate and design consult with Groundwork Construction Co. of West Covina. A live person answers around the clock, you get an upfront price before anything moves, and every job carries the 730-Day Done Right Promise. From foundation to finish line, we’ll show you the number and then hold to it.
Written by the team at Groundwork Construction Co. of West Covina, serving West Covina.


